夜月直播视频直播免费观看,娇妻玩4P被3个男人玩,人妻少妇AV中文字幕乱码,亚洲av永久无码精品

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.btmj.net/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

彩鋼板圍擋施工要注意什么?

來源:http://www.btmj.net/   發(fā)布時(shí)間:2023-05-04

1、圍擋定位

1. Fence positioning
依據(jù)業(yè)主下發(fā)的施工平面圖和現(xiàn)場(chǎng)狀況,對(duì)臨時(shí)圍擋進(jìn)行測(cè)設(shè)定位。放完線后,請(qǐng)業(yè)主予以確認(rèn),與圖紙不符部位及時(shí)進(jìn)行調(diào)整。
Based on the construction plan and site conditions issued by the owner, measure and locate the temporary enclosure. After setting out the line, please confirm with the owner and make timely adjustments to any discrepancies with the drawings.
2、立柱及板塊制作
2. Production of columns and plates
依據(jù)圖紙及現(xiàn)場(chǎng)測(cè)量尺寸,計(jì)算出需要制作立柱與板塊的數(shù)量。鋼材進(jìn)行防銹處理,刷紅丹防銹漆兩遍再將彩鋼板用鉚釘連接到方管龍骨上制成板塊,制作好的立柱及板塊龍骨都要進(jìn)行防銹處理,涂刷兩遍防銹漆。
Based on the drawings and on-site measurement dimensions, calculate the number of columns and plates that need to be made. The steel should be treated with rust prevention, painted with two coats of red lead rust prevention paint, and then riveted to the square tube keel to form a plate. The fabricated column and plate keel should be treated with rust prevention and coated with two coats of rust prevention paint.
3、基礎(chǔ)施工
3. Foundation construction
,根據(jù)彈設(shè)好的圍墻位置線及設(shè)計(jì)圖紙要求,開挖基坑,基坑尺寸600mm*600mm*600mm,及400mm*400mm*400mm,開始澆筑C20混凝土基礎(chǔ);同時(shí)將制作完成的預(yù)埋件安裝固定,預(yù)埋板采用150mm*150mm鋼板,混凝土澆筑過程中嚴(yán)格按照標(biāo)準(zhǔn)施工。澆筑完畢后,及時(shí)覆蓋并養(yǎng)護(hù)。
Firstly, according to the snapped position line of the fence and the requirements of the design drawings, excavate the foundation pit with dimensions of 600mm * 600mm * 600mm and 400mm * 400mm * 400mm, and start pouring C20 concrete foundation; At the same time, the completed embedded parts will be installed and fixed. The embedded plate will be made of 150mm * 150mm steel plates, and the concrete pouring process will be strictly carried out in accordance with national standards. After pouring, cover and maintain in a timely manner.
4、圍擋板塊安裝
4. Installation of enclosure plate
待基礎(chǔ)砼達(dá)到一定強(qiáng)度后,進(jìn)行立柱、板塊安裝,均勻分隔,焊機(jī)焊接 到預(yù)埋板上,全部焊接完畢后,對(duì)焊接情況進(jìn)行驗(yàn)收,合格后進(jìn)行板塊安裝。彩鋼板厚度為0.7mm,彩鋼板間骨架橫向方鋼規(guī)格50mm×50mm×2.5mm,縱向方鋼60mm×60mm×3.5mm,在每2.5米加焊斜撐 ,并且焊接完的位置重新做涂刷防銹處理。
彩鋼板圍擋
After the foundation concrete reaches a certain strength, the columns and plates should be installed, evenly separated, and welded to the embedded plate by a welding machine. After all welding is completed, the welding situation should be inspected and accepted. After passing the inspection, the plates should be installed. The thickness of the color steel plate is 0.7mm, and the horizontal square steel specification between the color steel plates is 50mm × 50mm × 2.5mm, longitudinal square steel 60mm × 60mm × 3.5mm, slant support shall be welded every 2.5m, and the welded position shall be repainted for rust prevention.
5、圍擋的維護(hù):
5. Maintenance of enclosure:
圍擋的作用的發(fā)揮以及良好的外部形象的體現(xiàn)關(guān)鍵在  日常的維護(hù)。安排一組人員進(jìn)行維護(hù)。日常維護(hù)包括:破損的維修,人員分別安排1名員帶領(lǐng)2名維護(hù)工人進(jìn)行巡查維護(hù)。在夜間施工期間以及特殊天氣期間增派人員進(jìn)行巡查維護(hù),確保。
The key to the safety function of the enclosure and the embodiment of a good external image lies in daily maintenance. Arrange a group of personnel for maintenance. Daily maintenance includes repairing damaged parts, with one safety officer and two maintenance workers arranged for inspection and maintenance. During nighttime construction and special weather periods, additional personnel are dispatched for inspection and maintenance to ensure safety.
二、質(zhì)量保證措施:
2、 Quality assurance measures:
1、圍擋的搭設(shè)應(yīng)整齊、嚴(yán)密、牢固、美觀。
1. The installation of fences should be neat, tight, firm, and aesthetically pleasing.
2、圍擋施工過程中,彩鋼板不能出現(xiàn)銹跡,要涂有保護(hù)材料。
2. During the construction process of the enclosure, the colored steel plate should not show rust and should be coated with protective materials.
3、圍擋施工完畢,彩鋼板與鋼管之間、鋼管與鋼管之間必須連接牢固,不得有松動(dòng)現(xiàn)象。
3. After the enclosure construction is completed, the connection between the color steel plate and the steel pipe, as well as between the steel pipe and the steel pipe, must be firm and there must be no looseness.
4、圍擋施工完畢,板與板之間銜接平順,直線段要在一條直線上;板與板之間不能留有明顯較大縫隙
4. After the enclosure construction is completed, the connection between the boards should be smooth, and the straight section should be in a straight line; There should be no significant gaps between the boards
本文由彩鋼板圍擋進(jìn)行編寫,想要了解更多的產(chǎn)品及更詳細(xì)的精彩內(nèi)容,請(qǐng)關(guān)注我們的網(wǎng)站:http://www.btmj.net我們將為您呈現(xiàn)更多的內(nèi)容。
This article is written by the color steel fence. For more products and detailed exciting content, please follow our website: http://www.btmj.net We will present more content for you.

国内真实愉拍系列情侣| 四十如虎的丰满熟妇啪啪| 久久久久久夜精品精品免费啦| BDSM变态狂极端妓女| 久久久精品人妻无码专区不卡| 久久婷婷五月综合国产尤物APP| 亚洲丰满多毛的隂户| 精品国产黑色丝袜高跟鞋| 激情五月色综合国产精品| 欧美激情A∨在线视频播放| 亚洲国产成人精品无码区在线秒播 | H工口全彩里番库18禁无遮挡| 男人添女荫道口视频| 久久人人爽人人爽人人片AV不| 国产精品久久| 老女人重囗味456| 欧美 亚洲 武侠 另类 动漫| 俄罗斯处破女A片出血| 亚洲人成人无码网WWW国产| 成年美女黄网站色大免费视频| 最近免费观看高清韩国日本大全| 久久99精品久久久久子伦| 男人10处有痣是富贵痣| 久久爽人人妻人人爽人人爽| JAPANESE熟睡侵犯| 97色偷偷色噜噜狠狠爱网站| 野花日本HD免费高清版1| 国产精品久久久久9999高清| 女人下边被添全过视频| 护士做爰乱高潮全过程| 将军猛烈顶弄H太子肉肉| 阿娇囗交13分钟在线播放| 办公室秘书跨坐蹭揉H| 国产AⅤ激情无码久久久无码| 亚洲AV日韩AV无码污污网站| 人妻被修空调在夫面侵犯| 色噜噜狠狠色综合久夜色撩人| 女浴室里赤裸裸洗澡丰满视频| 国产无遮挡18禁无码网站免费| 嗯啊H客厅HH粗汉H涨奶| 色偷偷久久一区二区三区|