濟(jì)南工地鋼筋加工棚如何搭設(shè)?

來(lái)源:http://www.btmj.net/   發(fā)布時(shí)間:2022-03-16

1、木工加工棚工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場(chǎng)地。鋼筋加工棚的長(zhǎng)和寬,一般會(huì)根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長(zhǎng)與寬尺寸。鋼筋加工棚工作臺(tái)的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來(lái),還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場(chǎng)地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and other types. The length and width dimensions can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed should also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing and after processing, the ground of the reinforcement processing shed should be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there should be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國(guó)際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場(chǎng)利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,在欄桿上鉤掛標(biāo)語(yǔ)橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。全拼裝式,快速組裝,拆卸簡(jiǎn)單,方便運(yùn)輸,型材及配件規(guī)格可按需求來(lái)定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, a number of steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings, and the construction of the whole reinforcement processing shed is completed with standardized design. Fully assembled, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
3、工地鋼筋加工棚需注意事項(xiàng):
3. Precautions for reinforcement processing shed on site:
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來(lái)定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed should be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo flakes, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語(yǔ)的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at the eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the width of the banner should be 1m.
4.加工車(chē)間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車(chē)間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩
7. In the south, in case of typhoon, windproof measures shall be taken, and wind ropes can be set

H工口全彩里番库18禁无遮挡| 国产无套流白浆视频免费 | 又硬又粗进去好爽A片| 国色天香精品一卡2卡3卡| 欧美人C交ZOOZOOXX| 亚洲熟妇少妇任你躁在线观看 | 大内密探零零性性| 大白肥妇BBVBBW高潮| 成人午夜精品无码区久久| 最近中文字幕无吗高清| 最近2019中文字幕免费直播| 欧美性猛交XXXX乱大交3| 国产真人无码作爱免费视频APP| 国精产品一区二区三区有限公司| 久久久久久伊人高潮影院| 睡着了被偷偷滑进去了| 人妻少妇久久中文字幕一区二区| 久草视频在线观看| 9孩岁女被A片免费观看| 搡女人真爽免费视频大全| 中文人妻熟妇乱又伦精品| 大伊香蕉精品视频在线天堂| 欧美做爰又粗又大免费看| 日本XXXX裸体XXXX免费| 国产强伦姧在线观看| 性欧美XXXXX极品少妇| 寂寞少妇扒开双腿猛烈进入免费看| 在教室伦流澡到高潮H| 亚洲人成网站999久久久综合| 亚洲丰满少妇XXXXX高潮| 久久亚洲精品无码AV网| 69久久国产精品亚洲大片| АⅤ资源天堂资源库在线| 亚洲AV无码一区二区三区在线观看| 精品无码国产av一区二区| 最近2019中文字幕在线| 我的漂亮女房东完整版在线| 国模少妇一区二区三区| 呦VODAFONEWIFI高清| 国产精品99久久久久久动态图| 成人性生交大片免费看中国|