夜月直播视频直播免费观看,娇妻玩4P被3个男人玩,人妻少妇AV中文字幕乱码,亚洲av永久无码精品

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.btmj.net/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

鋼筋加工棚的8點(diǎn)安裝事項(xiàng)

來源:http://www.btmj.net/   發(fā)布時(shí)間:2023-02-17

鋼筋加工棚是施工現(xiàn)場(chǎng)鋼筋調(diào)直、彎曲和焊接的場(chǎng)所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對(duì)接,(不要擰14個(gè)螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個(gè)螺絲)。否則,支架的孔沒有對(duì)齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個(gè)螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時(shí),確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個(gè)2.99米鉆尾,鋼筋加工棚4個(gè)2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.btmj.net咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.btmj.net consulting service

嘟嘟嘟WWW在线观看免费高清| 中文字幕乱码中文字乱码| 日韩国产精品无码一区二区三区 | А√天堂中文资源| 拍摄av现场失控高潮数次| 久久久久人妻精品一区三寸| 十二寡妇肉床艳史完整版| 人妻少妇精品无码专区漫画| 70岁老太把腿岔开给老头摸| 色婷婷狠狠18禁久久YYY| 亚洲国产精品SUV| 久久 国产 尿 小便 嘘嘘| 国产精品宅男擼66M3U8| 亚洲AV熟女国产一区二区三区| 五月天中文字幕MV在线| 扒开她粉嫩的小缝尿进去H漫画| 亚洲一线产区二线产区区| 亚洲日韩一区二区三区| 久久精品国产亚洲AV水果派| 撑开毛都没长齐的小缝| 久久天天躁狠狠躁夜夜不卡| 精品无人区无码乱码毛片国产| 无人区一码二码三码四码区| 精品乱人伦一区二区三区| 天天爽天天爽夜夜爽毛片| 黑人BBCVIDEOS极品| 一女被两根凶猛挺进动态图| 黑人粗大猛烈进出高潮视频 | 日产A一A区二区| 久久精品人妻无码一区二区三区盗| 精品一二三区久久AAA片| 多人伦交疯狂两根进出H视频| 麻豆免费视频网站入口在线观看| 粗大黑头紫大黑头紫挤进 | 国产V亚洲V天堂无码久久久| 又硬又粗进去爽A片免费视频| 国产精品久久久久久爽爽爽| 久久久久免费看A片特黄| AV中文字幕| 女人被狂躁C到高潮视频| 国产精品99久久久久久人韩国|